Loading Events
  • This event has passed.

« All Events

Warning Line System Installation

May 10, 2020 - May 11, 2020

The warning line system shall consist of ropes, wires, or chains, and supporting stanchions (29 CFR 1926.502(f)(2)). The warning line system shall: ? be erected not less than 6 feet (1.8 m) from the roof edge (29 CFR 1926.502(f)(1) (i)); not less than 10 feet when mechanical equipment is used (29 CFR 1926.502(f)(1)(ii));
? be flagged at least every 6 feet with highvisibility material (29 CFR 1926.502(f)(2)(i));
? be no less than 34 inches (.9 m) and no more than 39 inches (1.0 m) from the walking/ working surface (29 CFR 1926.502(f)(2)(ii));
? be capable of resisting a force of at least 16 pounds (71 N) without tipping over (29 CFR 1926.502(f)(2)(iii));
? have a minimum tensile strength of 500 pounds (2.22 kN) (29 CFR 1926.502(f)(2)(iv));
? be attached in such a way that pulling on the line will not result in slack being taken up in adjacent sections before the stanchion tips over (29 CFR 1926.502(f)(2)(v)).

Details

Start:
May 10, 2020
End:
May 11, 2020
Event Category: